The photo shows the construction of the two 230 m spans of the bridge using the balanced cantilever method. Our system allowed the casting of segments up to 420 t in a single phase, installing wing and overhead formwork with high precision. Every movement was designed to maintain deck stability and accuracy, achieving a world engineering record.